Your Team's Workarounds Are Evidence, Not Failure

By Logan Henderson· October 21, 2026· 12 min read
Your Team's Workarounds Are Evidence, Not Failure

Your Team's Workarounds Are Evidence, Not Failure

Your team's workarounds show where their tools fall short. Treat those steps as evidence of effort, ask staff what each one preserves, and build your case from their own conservative estimates. You earn support for change when people can see how better equipment will help them do work they already care about.

Key takeaways

  • Start with the work an unofficial step covers, not criticism of the person using it.
  • Turn each workaround into a requirement your next process must satisfy.
  • Build the time case from staff estimates, using the low end and counting each task once.
  • Retire a fallback only after its replacement handles the real work.

THE PATTERN

Why does criticism make change harder?

Respect the effort first. If you open a change conversation by attacking the habits keeping work moving, you give your team a reason to defend them. Your next system then arrives carrying a judgment about the people expected to use it.

In the engagements we run, the fastest way to kill a new system is to start with what the team is doing wrong. The spreadsheets, sticky notes, and side conversations they built are evidence of effort. They kept customers served while the official process dropped details. That is effort, not incompetence.

Picture a dispatcher copying a customer's revised access instructions from a message onto a note beside the schedule. At the change meeting, you point to the note and call it a bad habit. The dispatcher hears criticism of the very action that kept the crew from arriving unprepared.

Ask what the note accomplishes, and you get a different conversation. The schedule has nowhere dependable to put changing access instructions, and your team created a way to keep those details close to the work. You now have a need to investigate, and the dispatcher has a reason to help.

A workaround is a clue about the work.

When you find information copied between places, reminders sent through side channels, or unofficial lists, start by asking what would break if those steps stopped. You need to understand what they guard and who depends on the result before deciding which part of the process should change.

This is Vista's Real-Constraint Lens: trace recurring friction to the condition limiting the work, using the habit you can see as your starting point. The constraint may be missing equipment, a weak handoff, or a rule nobody can follow in practice, so investigate before you settle on a fix.

Your symptom versus real constraint diagnosis should precede a purchase decision, or you can buy a better-looking system that leaves the same handoff unsupported. When that happens, the old notes and side conversations have a reason to return.

THE INTERVIEW

How do you inventory workarounds without blame?

Ask about the work. Your first interview should identify what the unofficial step covers, when it becomes necessary, and who depends on its result. Save your opinions about tidiness or compliance until you understand that sequence.

Invite the person doing the task to show you a recent example, then follow the actual steps beside them, including the unofficial ones. A description like "we update the customer record" can hide copying, checking, chasing, and retyping that nobody includes in the formal process.

Use this short interview script:

  • "Walk me through what happens when this information changes."
  • "What does this extra step make sure you don't miss?"
  • "When did you start doing it this way?"
  • "Who uses the result, and how do they know it's ready?"
  • "What would the normal process need to do so you could stop?"
  • "How much time does this usually take, from beginning to end?"

Keep your response neutral: "Show me where that happens" invites detail, while asking why they aren't using the system properly turns the interview defensive. You are trying to learn how work travels, including the places where your current setup stops helping.

Record the trigger, extra action, protected outcome, and next person in the chain, and keep the person's explanation in their own words where possible. "I need to know the crew got the change" tells you more than a broad label like "communication problem."

Ask about exceptions as well as routine work. A process might handle an ordinary request and fail when details change after work starts. If your interview only follows the easiest path, you can miss the reason that side process exists at all.

Workarounds-as-Evidence. Vista's lens treats an unofficial step as evidence of an unmet operational need. Investigate that need, then decide what support the person doing the work needs.

Finish by reading your notes back to the person, and ask what you missed and what you described incorrectly. That gives your team a chance to shape the diagnosis before it becomes a plan someone else presents on their behalf.

THE REQUIREMENTS

What should a workaround become in your next process?

Write the requirement before shopping. Each workaround should become a statement about what your team needs to accomplish, including the exceptions that matter. A feature list is premature until you can explain the task those features must support.

Take this table into your interviews. The person doing the work will tell you which need is real and which guess to throw out.

Workaround you see What it proves the team needs The question to ask
A separate list of unfinished requests A dependable way to track unfinished work What tells you a request is still open?
A note beside the schedule Critical changes available where work is assigned Which detail has nowhere dependable to live?
The same detail copied into several records Information that reaches each place it is needed Where must this detail arrive after it changes?
A message asking if someone saw an update Confirmation at a handoff What counts as acknowledgment?
An unofficial checklist kept near the task Instructions that fit the actual work Which step does the current process leave out?

For each requirement, describe the trigger, expected behavior, and evidence that the job is complete. "Better communication" is too broad to test. "When access instructions change, the assigned crew can see the current instructions and acknowledge them" gives you a task to demonstrate.

Separate the requirement from the current method. Your team needs proof the change reached the crew. That does not mean another reminder message. A better rule inside the process you already have may do the job.

Name the person who will carry the change through everyday work. Why tool rollouts stall without a champion shows what happens when nobody owns it.

A replacement earns adoption by handling the work your team already covers.

Once you understand the sequence, write SOPs faster with AI by turning interview notes into a draft your staff can check against each step. The procedure should preserve their operational knowledge while removing duplicate effort, with staff confirming that the new process can handle each part.

Ask for a demonstration using your own workflow before approving a replacement, including the exception that originally caused the manual patch. Your team should be able to say, "That handles the problem we showed you," before you ask them to abandon their fallback.

THE CASE

How do you build a case the team can stand behind?

Use their lowest defensible estimate. A pattern we see in engagements: ask staff to estimate their own time on a workaround, then use the low end. Nobody in the room can argue with the case. You have answered the exaggeration objection before anyone raises it.

Ask for a range when the task varies, then ask what makes the slow version different from the quick version. You might discover an ordinary copying task mixed with an occasional search for missing information, so separate those activities before calculating anything.

Use this method for each workaround:

  1. Name the extra task, including its start and finish.
  2. Ask staff for the time range they can defend.
  3. Use the low end of that range.
  4. Count how often the task actually occurs in a defined period.
  5. Multiply the low time estimate by the observed occurrences.
  6. Check that the same minutes are not counted elsewhere.

The math is one line: low estimate per occurrence, times observed occurrences, equals time spent in that period. Keep it that simple.

Count work, not waiting. A request that sits overnight did not cost a night of labor, and a message forwarded between several people is still one task. A busy stretch is not every week either, so ask staff how that period compares with normal before you project it forward.

Time spent is not cash saved. Show the repeated work first. Then name what recovered capacity could support, such as faster responses or fewer interruptions, before making a financial case.

Put the estimate beside the evidence that produced it, and keep the staff range, observation period, occurrence count, and any excluded activity available for review. You want your team to recognize their work in the case, including the assumptions they helped you make.

Include the cost of changing the process in your decision, since setup, learning, and checking all take effort. Your case becomes stronger when you explain what the replacement must remove and what the team will need to do during the transition.

Use one completed observation period and keep each workaround attached to the job it protects. Ask staff to confirm the estimate and count before combining tasks.

What you need to knowWhy it matters
The period you actually observedA busy stretch does not automatically describe every week.
Each extra task and the person or role doing itThis keeps the estimate attached to recognizable work.
The job the workaround protectsA replacement must handle that job before the extra step can stop.
The lowest time per occurrence that staff can defendThe low estimate gives the team a conservative starting point they can stand behind.
How many times the task actually happened in that periodMultiply the lower time estimate by observed occurrences for each task.
Whether any minutes overlap or include waitingCount each person's working minutes once and exclude time spent waiting for someone else.
The combined observed timeAdd the separate task totals, then divide minutes by 60 to express the result in hours.
The task contributing the most timeThis gives you a concrete interview starting point, while the protected job determines what the fix must accomplish.
If this is trueYour resultWhat to do next
The estimates are unconfirmed, work overlaps, or waiting time remains in the countYour time case is not ready to add up.Review the rows with staff, separate the work, and remove waiting before combining them.
Staff confirmed the counting, but the estimates and observed occurrences add up to no working timeThis record does not yet quantify extra working time.Revisit the observation and ask what the workaround protects; a zero time estimate does not prove the process is working.
Confirmed estimates and distinct observed occurrences add up to extra working timeYour staff's low estimates give you an observed time case.Start with the largest contributing task, preserve the job it protects, and test the replacement before retiring the workaround.

This describes time spent in the process you observed. It does not promise that all those hours will disappear or turn into cash savings. Bring the inventory to a Vista working session if you need help turning it into requirements and a change plan.

THE CHANGE

How do you present the change and retire the workaround?

Lead with better equipment. In the engagements we run, teams adopted tools faster with "you deserve better equipment" than with "this will make you more efficient." People invest in being equipped. Nobody invests in being fixed.

Start with the task your team showed you, describing what they keep from slipping, what the process fails to support, and what must replace it. Then show the conservative time case with the people who supplied the estimates able to correct your account of the work.

Try this: "You've kept these changes from getting lost by maintaining an extra record, and we want the normal process to carry that responsibility. Here's what it needs to do, and here's the time you've told us the extra work takes."

Better equipment gives your team a reason to change.

Give staff a role in the acceptance check, and let them run the new process through an ordinary task and a troublesome exception. Then ask what still needs an unofficial step. The answer tells you if the replacement supports the job or just moves the extra effort somewhere else.

Before you announce the switch, check the following:

  • You can name what each unofficial step guards.
  • Staff have corrected your description of the current work.
  • Requirements describe behavior you can demonstrate.
  • Time estimates use the low end and avoid duplicate counting.
  • Someone owns questions and exceptions during the transition.
  • The replacement has handled the task that caused the fallback.
  • You have agreed when the old method can stop.

Keep a fallback available while you prove the replacement, and set a review point for retiring it. Leaving both methods active indefinitely creates another process to maintain. Removing the fallback before the replacement works gives staff a reason to rebuild it privately.

If the team still resists, ask which job remains unsupported. Resistance is data. It points to a missing requirement, a painful handoff, or a decision nobody owns. Go back to that evidence before you repeat the pitch.

If you need help turning the inventory into a change plan, book a Vista working session. Bring the unofficial steps and the staff explanations behind them, so we have something concrete to diagnose, test, and help your team handle.

PRACTICAL ANSWERS

Frequently asked questions

Start with the job. These answers help you decide what to keep, what to replace, and how to make the case with your team.

Are workarounds always a sign that you need new software?

No. Workarounds can point to missing equipment, an incomplete procedure, a weak handoff, or an unassigned decision. Ask what the unofficial step keeps from slipping before choosing a fix. Often you can meet the requirement by fixing the process you already have.

How do you ask staff about workarounds without sounding critical?

Ask staff to show you how a recent task moved from start to finish. Focus on what each extra step prevents or makes possible, and read your notes back to invite corrections. Keep judgments about habits out of the interview until you understand the job the workaround performs.

Why should you use the low end of a time estimate?

Using the low end gives you a conservative starting point your team can defend. Keep the full range in your notes, multiply the lower estimate by observed occurrences, and check for duplicate counting. The result describes estimated time spent, which you can then discuss alongside the cost of changing.

What does Vista's Real-Constraint Lens mean here?

Vista's Real-Constraint Lens traces recurring friction to the condition limiting the work, starting from an unofficial step and investigating the purpose it serves. Turn that purpose into a requirement before selecting a replacement, keeping your change plan focused on the problem staff actually face.

When should you ask your team to stop using a workaround?

Retire a workaround after its replacement demonstrates that it handles the work and important exceptions, with a review point and someone who owns unresolved problems. A temporary fallback can support the transition, but maintaining both methods indefinitely adds work, so agree when the old method can stop.

How should you present the case for changing the process?

Open with the effort your team already makes and the work your current setup leaves unsupported. Show requirements drawn from staff interviews and a time estimate they helped build. Explain how the replacement will equip them, then let them test it so their operational judgment becomes part of the decision.

Frequently asked questions

Are workarounds always a sign that you need new software?
No. Workarounds can point to missing equipment, an incomplete procedure, a weak handoff, or an unassigned decision. Ask what the unofficial step keeps from slipping before choosing a fix. Often you can meet the requirement by fixing the process you already have.
How do you ask staff about workarounds without sounding critical?
Ask staff to show you how a recent task moved from start to finish. Focus on what each extra step prevents or makes possible, and read your notes back to invite corrections. Keep judgments about habits out of the interview until you understand the job the workaround performs.
Why should you use the low end of a time estimate?
Using the low end gives you a conservative starting point your team can defend. Keep the full range in your notes, multiply the lower estimate by observed occurrences, and check for duplicate counting. The result describes estimated time spent, which you can then discuss alongside the cost of changing.
What does Vista's Real-Constraint Lens mean here?
Vista's Real-Constraint Lens traces recurring friction to the condition limiting the work, starting from an unofficial step and investigating the purpose it serves. Turn that purpose into a requirement before selecting a replacement, keeping your change plan focused on the problem staff actually face.
When should you ask your team to stop using a workaround?
Retire a workaround after its replacement demonstrates that it handles the work and important exceptions, with a review point and someone who owns unresolved problems. A temporary fallback can support the transition, but maintaining both methods indefinitely adds work, so agree when the old method can stop.
How should you present the case for changing the process?
Open with the effort your team already makes and the work your current setup leaves unsupported. Show requirements drawn from staff interviews and a time estimate they helped build. Explain how the replacement will equip them, then let them test it so their operational judgment becomes part of the decision.

Vista Insights

Get new posts in your inbox

Practical AI and advisory insights for operators, sent as they publish. No spam, unsubscribe anytime.

By subscribing you agree to receive the Vista Insights newsletter from Vista Advising Group. Unsubscribe anytime.

Logan Henderson

Logan Henderson

Founder, Vista Advising Group. Writes about using AI for real operating work.

Keep reading